AREAS OF APPLICATION
- WW shaft head mortar according to DIN 19573
 - especially for height regulation of manhole covers
 - Product according to DIN EN 1504-6 “Anchoring of reinforcing bars”
 - for all areas in which high early loads occur
 - for the casting of machines of all kinds and anchorages
 - for outside and inside
 
DOWNLOADS
Technical data sheet quick-mix S-FIXPDF | 190KB
Safety data sheet quick-mix S-FIXPDF | 217KB
Declaration of performance quick-mix S-FIXPDF | 104KB
TECHNICAL INFORMATION

PRODUCT VARIANTS

PRODUCT FEATURES
properties
- Consistency: flowable
 - Degree of swelling: ≥ 0.1%
 - Compressive strength:
≥ 15 N/mm² (1 h)
≥ 40 N/mm² (24 h)
≥ 55 N/mm² (28 d) - easy to mix
 - faster curing
 - flowable
 - shrinkage free
 - frost and de-icing salt resistant
 - good adhesion to concrete and steel
 - easy hand processing
 
composition
- high-quality binding agents according to DIN EN 197-1
 - mineral additives according to DIN EN 13139 / DIN EN 12620 (alkali sensitivity class EI)
 - Additives with building authority approval
 - chloride free
 
form of delivery
- 25kg/bag
 
PROCESSING
underground
preparation
- Clean the ground. Remove loose parts, dust, cement slurry, oil and grease.
 - Thoroughly wet the substrate, but avoid puddle formation.
 
processing
temperature
- Do not apply and allow to dry / set at air, material and substrate temperatures below +5 °C and when night frost is to be expected and above +30 °C, direct sunlight , strongly heated substrates and/or strong winds.
 
Mixing / preparing / processing
- Mix S-Fix as a complete container with approx. 4.5 liters of clean water in a compulsory mixer for at least 3 minutes.
 
Application / processing
- The mortar must be poured without any cavities and without interrupting work. Pay attention to ventilation.
 - The formwork must be tight and if possible non-absorbent.
 
workable time
- depending on water addition and temperature conditions maximum 5 to 10 minutes
 - Mortar that has already set must not be diluted with additional water, mixed up and further processed.
 
drying / hardening
- The applied mortar must be post-treated in accordance with DIN EN 13670 / DIN 1045-3.
 
tool cleaning
- Clean tools and equipment with water immediately after use.
 
consumption / yield
- Yield: approx. 14 l wet mortar per sack
 


